Regenerate the stale ER diagram and gate it

Table of Contents

This page is a capture in the inbox= bucket of the product backlog — a pre-sprint idea, not yet pulled into a sprint as a story.

1. What

(One paragraph: the idea.)

2. Why

(Motivation, problem being solved, related context.)

3. References

4. See also

Emacs 29.3 (Org mode 9.6.15)