Story: Commission: business_unit

Table of Contents

This page documents a story in Sprint 22. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

Goal

Commission business_unit across all access layers: verify the Qt UI end-to-end post-NATS migration, fix any regressions found, and add the entity chapter to the user manual (Qt windows only — shell and CLI commands are a horizontal layer handled by the top-level Shell entity commands and CLI commands commissioning stories, not per-entity). File backlog captures for Wt and HTTP support.

Status

Field Value
State BACKLOG
Parent sprint Sprint 22
Now Not yet started.
Waiting on Nothing.
Next Break the story into tasks.
Last touched 2026-05-29

Acceptance

  • Qt list window (MDI): loads and displays records correctly.
  • Qt detail window: edit and save round-trips without error.
  • Qt history window: shows change history for the entity.
  • Qt delete command: removes the record; history is preserved.
  • Qt eventing: a change made in one connected session appears in a second session without manual refresh.
  • Manual: entity chapter documents all Qt windows (shell and CLI sections added later, once the top-level Shell entity commands / CLI commands stories reach this entity).
  • Backlog captures filed for shell, CLI, Wt, and HTTP support.
  • All regressions found are fixed inline or filed as captures.
  • Site builds cleanly.

Tasks

Task State Start End Description
         

Emacs 29.3 (Org mode 9.6.15)