Work units should use a combo box

Table of Contents

This page is a capture in the next bucket of the product backlog — a pre-sprint idea, not yet pulled into a sprint as a story.

What

(One paragraph: the idea.)

Why

(Motivation, problem being solved, related context.)

References

See also

Work units (time-tracking / effort units) are currently entered as a free-text field in some forms. Replace with a combo box populated from the work unit lookup table, matching the pattern used for other enumeration-backed fields.

Emacs 29.1 (Org mode 9.6.6)