Task: White-boarding for new architecture

Table of Contents

This page documents a task in the Sprint 02 housekeeping story. It captures the goal, current status, acceptance, and any notes or results.

1. Goal

Whiteboard the client/server architecture before implementation starts: where does the boundary sit, which types cross it, which process owns what, and how messages flow.

2. Status

Field Value
State DONE
Parent story Sprint 02 housekeeping
Now Completed 2025-09-15.
Waiting on None.
Next None.
Last touched 2025-09-15

3. Acceptance

  • A whiteboard artefact (drawing or org-mode notes) captures the client/server boundary.
  • Message flow for at least one end-to-end operation is sketched.
  • The artefact is referenced from the cobalt implementation tasks.

4. Notes

  • Total time spent in v0: ~1:52.
  • Output drove the cobalt and comms implementation work.

5. Result

  • Architecture sketch captured; implementation work referenced it throughout.