Story: Sprint 03 housekeeping

Table of Contents

This page documents a story in Sprint 03. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

Goal

Catch the sprint-level work that has to happen for the sprint to function but does not deliver a user-visible outcome: backlog refinement and a misspelled symbol that was failing the build.

Status

Field Value
State DONE
Parent sprint Sprint 03
Now Story closed; sprint backlog tidy, build-break misspell fixed.
Waiting on None.
Next None.
Last touched 2025-12-31

Acceptance

  • Sprint backlog matches delivered work at sprint close.
  • The misspell that was breaking the build is fixed.

Tasks

Task State Start End Description
Sprint and product backlog refinement DONE 2025-12-31 2025-12-31 Maintain sprint 03 backlog and groom product backlog through the sprint.
Fix misspell that breaks the build DONE 2025-12-31 2025-12-31 Repair a misspelled symbol that surfaces as a build break.

Decisions

Postponed items don't disappear
the v0 record had three POSTPONED entries that vanished into the retrospective. In v2 they are listed here explicitly and either become successor stories or go to the product backlog.

Out of scope

  • Long-term agile tooling.

See also