Story: Sprint 03 housekeeping
Table of Contents
This page documents a story in Sprint 03. It captures the goal, current status, acceptance criteria, and the tasks that compose it.
Goal
Catch the sprint-level work that has to happen for the sprint to function but does not deliver a user-visible outcome: backlog refinement and a misspelled symbol that was failing the build.
Status
| Field | Value |
|---|---|
| State | DONE |
| Parent sprint | Sprint 03 |
| Now | Story closed; sprint backlog tidy, build-break misspell fixed. |
| Waiting on | None. |
| Next | None. |
| Last touched | 2025-12-31 |
Acceptance
- Sprint backlog matches delivered work at sprint close.
- The misspell that was breaking the build is fixed.
Tasks
| Task | State | Start | End | Description |
|---|---|---|---|---|
| Sprint and product backlog refinement | DONE | 2025-12-31 | 2025-12-31 | Maintain sprint 03 backlog and groom product backlog through the sprint. |
| Fix misspell that breaks the build | DONE | 2025-12-31 | 2025-12-31 | Repair a misspelled symbol that surfaces as a build break. |
Decisions
- Postponed items don't disappear
- the v0 record had three POSTPONED entries that vanished into the retrospective. In v2 they are listed here explicitly and either become successor stories or go to the product backlog.
Out of scope
- Long-term agile tooling.