Sprint 06

Table of Contents

This page documents a sprint (Sprint 06) of ORE Studio v0. It captures the sprint's mission, current status, and the stories that compose it. For the surrounding context — version goals, sprint order, and product identity — see Version 0.

Mission

Finish domain-entity follow-ups (session cancellation, feature-flag service); make the comms substrate production-ready; tidy bootstrap and logging surfaces.

(The v0 mission had a second clause — templatise domain entity generation — that did not land. The Experiment with simple code generation entry was CANCELLED. Templatised generation reappears in later sprints with the codegen-driven approach.)

Status

Field Value
State DONE
Parent version Version 0
Previous Sprint 05
Start 2025-12-01
End (expected) 2025-12-13
Now Nothing.
Waiting on Nothing.
Next Sprint 07
Release Notes Release notes
Last touched 2025-12-15

Achievements

  • Session cancellation live.
  • Variability is its own service.
  • Comms substrate has handshake/protocol split and retry.
  • Logging migrated to std::string_view (with the inevitable post-migration cleanup).
  • Two predecessor links from sprint 05 closed.

Stories

For the definitions of the themes see Themes.

Infrastructure

Story State Start End Description
Session lifecycle follow-up DONE   2025-12-04 successor of sprint 05's authentication bootstrap; lands session cancellation + logout + client heartbeat.
Comms robustness DONE   2025-12-10 split protocol, handshake service, multi-thread coverage, retry-with-give-up.
Logging refactor (std::string_view) DONE   2025-12-12 migration + fallout.
Infrastructure features DONE   2025-12-15 event bus, system tray, past-timepoint faker.

Product

Story State Start End Description
Variability service DONE   2025-12-08 feature-flag service end-to-end.
Bootstrap polish DONE   2025-12-13 context to DB, drop bootstrap flag, manifest password-validation knob.

Tooling

Story State Start End Description
CLI entity syntax follow-up DONE   2025-12-13 successor of sprint 05's CLI/REPL reshape; mops up snags and adds top-level shell login/logout.

Agile

Story State Start End Description
Sprint 06 housekeeping DONE   2025-12-15 backlog, AI summary via the skill, OCR.

Charts

Charts generated via sprint_charts cmake target.

PRs & Commits per Day

Dual-axis bar chart. PRs (left axis) and commits (right axis) per day. A high commits-to-PR ratio may indicate scope creep.

prs_commits.png

Daily Line Churn

Lines added (green) and deleted (red) per day. Building work produces mostly additions; refactoring produces a mix. Days with no churn may indicate blockers.

line_churn.png

Cumulative Stories Done

Line chart tracking stories marked DONE during the sprint. Steady upward slope is healthy; plateauing signals a stall.

stories_done.png

Retrospective

What worked
Boost.Asio session cancellation — initially planned as a tidy hierarchical-signal solution, broken by the one-slot-per- signal limitation, recovered via explicit session-list management. The pivot caught in flight pattern is the right way to handle upstream surprises. Two cross-sprint successors closed cleanly.
What did not
the second mission clause (templatise domain entity generation) didn't land. The codegen experiment was CANCELLED, and templatisation reappears later with the v2 codegen approach. Worth being more conservative about second mission clauses in future sprints.
Carry forward to v2
the LISTEN/NOTIFY thread started here but the full client fan-out is incomplete; expect a successor story in a later sprint when the event bus gets its second consumer.