Story: Wt and HTTP review

Table of Contents

This page documents a story in Sprint 08. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

Goal

Validate the Wt application and HTTP service introduced in sprint 07. Raise the snag lists; write recipes covering the HTTP surface; document the OpenAPI generator.

Status

Field Value
State DONE
Parent sprint Sprint 08
Now Completed 2026-01-06.
Waiting on None.
Next None.
Last touched 2026-01-06

Continued from: Wt and HTTP introduction (sprint 07) — that story put the scaffolding in place; this one validates and documents it.

Acceptance

  • Wt application validated; bug list filed for follow-up.
  • HTTP service swagger working; recipes cover the surface.
  • OpenAPI generation documented.

Tasks

Task State Start End Description
Check functionality in ores.wt DONE 2026-05-19 2026-01-02 Validate the Wt application end-to-end; raise bugs (theming, hard-coded currencies, password in log, dialog sizing, site logo).
Review HTTP service DONE 2026-05-19 2026-01-06 Validate swagger; write recipes covering the HTTP surface; document the OpenAPI generator.

Decisions

Validation first, fixes later
keeps the review pass tight; the resulting bug list feeds future sprints.

Out of scope

  • Implementing the Wt bugs raised here (theming, hard-coded currencies, password-in-log).

See also

Emacs 29.1 (Org mode 9.6.6)