Story: Sprint planning
Table of Contents
This page documents a story in Sprint 19. It captures the goal, current status, acceptance criteria, and the tasks that compose it.
Goal
Sprint 19 has a selected, sized set of stories pulled from the product backlog, each broken into tasks and wired into the sprint, with the sprint mission confirmed.
Status
| Field | Value |
|---|---|
| State | DONE |
| Parent sprint | Sprint 19 |
| Now | Nothing. |
| Waiting on | Nothing. |
| Next | Merge PR #927. |
| Last touched | 2026-05-29 |
Acceptance
- Stories selected from the product backlog and wired into sprint 19.
- Each story has at least one task sized and ready to start.
- Sprint mission confirmed.
- PR open; site builds cleanly.
Tasks
| Task | State | Start | End | Description |
|---|---|---|---|---|
| Scaffold sprint planning story | DONE | 2026-05-29 | 2026-05-29 | Scaffold story and task docs, wire into sprint, open PR. |
| Run sprint planning session | DONE | 2026-05-29 | 2026-05-29 | Select stories from backlog, size tasks, confirm mission. |
Out of scope
- Version bump (already done).
- Story implementation (this story only plans the sprint).