Story: Sprint planning

Table of Contents

This page documents a story in Sprint 19. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

Goal

Sprint 19 has a selected, sized set of stories pulled from the product backlog, each broken into tasks and wired into the sprint, with the sprint mission confirmed.

Status

Field Value
State DONE
Parent sprint Sprint 19
Now Nothing.
Waiting on Nothing.
Next Merge PR #927.
Last touched 2026-05-29

Acceptance

  • Stories selected from the product backlog and wired into sprint 19.
  • Each story has at least one task sized and ready to start.
  • Sprint mission confirmed.
  • PR open; site builds cleanly.

Tasks

Task State Start End Description
Scaffold sprint planning story DONE 2026-05-29 2026-05-29 Scaffold story and task docs, wire into sprint, open PR.
Run sprint planning session DONE 2026-05-29 2026-05-29 Select stories from backlog, size tasks, confirm mission.

Out of scope

  • Version bump (already done).
  • Story implementation (this story only plans the sprint).

Emacs 29.1 (Org mode 9.6.6)