Timeline: 2026-06-07 10:00 → 11:00

Table of Contents

Summary

  • Windows shell link failure hotfixed (story created with work already done); sprint 20 opening ceremony closed; timeline story PR opened.

Stories

Story Event Notes
Hotfix: ores.shell tests fail to link on Windows created (STARTED) Tasks arrived already DONE — post-hoc bookkeeping.
Open sprint 20 STARTED → DONE Opening ceremony complete.

Pull requests

PR Event Title
#1165 opened agile timeline story scaffold
#1164 merged hierarchical dropdown site menu
#1166 opened shell public-surface hotfix
#1167 opened sprint 20 housekeeping / status drift

Problems and suspicious decisions

  • The hotfix story's tasks were created in state DONE — acceptable for hotfixes (work precedes paperwork) but the pattern hides cycle time; flag if it spreads to non-hotfix stories.

Audit

  • PR #1167 ("fix status drift") existing at all means drift had accumulated — the states fixed there drifted without timeline visibility; exactly what these snapshots are for.
  • No environment stamps yet — attribution unavailable.

Emacs 29.1 (Org mode 9.6.6)