Story: Sprint 23 planning session

Table of Contents

This page documents a story in Sprint 23. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

Goal

Give sprint 23 a real starting backlog: work through the product backlog and past-sprint carry-overs, promoting well-specified captures into sprint 23 stories and pulling in stories that were misfiled (wrong bucket/sprint folder) or mislabeled (marked ABANDONED in a sprint table with no corresponding decision recorded), verifying each one's premise against the live codebase rather than trusting its own text. Also extend the agile-refine-backlog skill with a deep mode, so future backlog audits of this kind are a repeatable, reported procedure rather than one-off manual work.

Status

Field Value
State DONE
Parent sprint Sprint 23
Now Nothing — all three tasks done.
Waiting on Nothing.
Next Nothing.
Last touched 2026-07-11

Acceptance

  • Sprint 23 has a working set of well-specified, verified stories to pick up (not just "Open sprint 23" scaffolding).
  • Every misfiled/mislabeled sprint-22/sprint-19 story found is corrected: moved to its correct sprint folder, filetags/parent-links fixed, and wired into the correct sprint's Stories table.
  • Every promoted capture is verified against the current codebase before being trusted (confirmed still-unaddressed, not already resolved elsewhere).
  • Duplicate captures are merged with no content loss, not silently deleted.
  • agile-refine-backlog gains a deep mode covering inbox/next/deferred with a written report, so this kind of audit doesn't require re-deriving the process each time.

Tasks

Task State Start End Description
Promote and pull in sprint 23 stories from the backlog DONE 2026-07-11 2026-07-11 Promote well-specified backlog captures into sprint 23 stories and pull in misfiled/mislabeled sprint-22/sprint-19 stories, verifying each against the live codebase before acting.
Deep backlog refinement DONE 2026-07-11 2026-07-11 Ran the agile-refine-backlog skill's deep mode: audited all 559 items in inbox/next/deferred against the live codebase, discarded/relocated 71, merged 1 duplicate pair. Next→deferred rescoring flagged as a follow-on run.
Bucket rescoring against sprint 23's mission DONE 2026-07-11 2026-07-11 Scored all 488 surviving items against sprint 23's mission; moved 310, emptied inbox (208→0), next 224→273, deferred 56→215.

Decisions

Out of scope