Story: Sprint health review — System 2 analysis
Table of Contents
This page documents a story in Sprint 23. It captures the goal, current status, acceptance criteria, and the tasks that compose it.
Goal
Produce a structured System 2 health review of sprint 23 covering goal alignment, sprint load, PR velocity, focus signal, and story/task balance.
Status
| Field | Value |
|---|---|
| State | DONE |
| Parent sprint | Sprint 23 |
| Now | Health review 1 complete (RED). |
| Waiting on | Nothing. |
| Next | Nothing. |
| Last touched | 2026-07-20 |
Acceptance
- Review written and filed in task Result; summary row added to sprint.org Health Review section.
Tasks
| Task | State | Start | End | Description |
|---|---|---|---|---|
| Health review 1 — sprint 23 analysis | BACKLOG | System 2 health review 1 of sprint 23. |