Story: Sprint health review — System 2 analysis

Table of Contents

This page documents a story in Sprint 23. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

Goal

Produce a structured System 2 health review of sprint 23 covering goal alignment, sprint load, PR velocity, focus signal, and story/task balance.

Status

Field Value
State DONE
Parent sprint Sprint 23
Now Health review 1 complete (RED).
Waiting on Nothing.
Next Nothing.
Last touched 2026-07-20

Acceptance

  • Review written and filed in task Result; summary row added to sprint.org Health Review section.

Tasks

Task State Start End Description
Health review 1 — sprint 23 analysis BACKLOG     System 2 health review 1 of sprint 23.

Decisions

Out of scope

Emacs 29.3 (Org mode 9.6.15)