Task: Close story: badge colour scheme visual polish and self-badging fixes

Table of Contents

This page documents a task in the Badge colour scheme: visual polish and self-badging fixes story. It captures the goal, current status, acceptance, and any notes or results.

Goal

Both of this story's tasks (Badge palette swatch rendering + data-driven fallback badge, Badge sources should badge their own list too) are DONE, built, and unit-tested, but neither recorded a manual QA * Test Scenarios run – the story's own * Status table flags this ("Waiting on: Manual QA of the self-badging task (live client, not performed this session)"). Close the story's bookkeeping now per explicit instruction, rather than leave it sitting at 90% indefinitely; record the missing manual QA honestly rather than silently closing over it.

Status

Field Value
State DONE
Parent story Badge colour scheme: visual polish and self-badging fixes
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-07-30

Acceptance

  • [X] Both sibling tasks confirmed DONE.
  • [X] Story's * Status=/=* Acceptance reviewed against actual task outcomes; manual QA gap recorded rather than silently dropped.
  • [X] Story flipped to DONE, sprint row updated.

Plan

(Implementation strategy. Written when work starts; key decisions are distilled into the parent story's * Decisions at close, but the plan itself stays — it is the historical record of what we did.)

Notes

Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario, run through the QA Validation Runner panel) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

PRs

PR Title
#1765 [agile] Close story: badge colour scheme visual polish and self-badging fixes

Review

# Comment summary File Decision Notes
1 #+updated: front-matter still 2026-07-21 despite Last touched being bumped to 2026-07-30 badge_colour_scheme_snags/story.org Fixed Bumped #+updated to match.
2 Sprint 24's own #+end_date (2026-07-28) is now behind this story's close date (2026-07-30) sprint.org Declined Not this PR's concern – other DONE stories in the same table closed past that date too; needs reconciling whenever Sprint 24 itself closes.

Result

Closed the story: both tasks were already DONE; flipped the story to DONE and updated the sprint row. No manual QA * Test Scenarios run was ever recorded for either sibling task despite the story's own * Status flagging it as outstanding – noted here rather than silently closed over, in case the swatch rendering/fallback badge/self-badging behaviour needs a live-client pass later.

Emacs 29.3 (Org mode 9.6.15)