Task: Roll out the classification tool to all remaining components and delete stale docs

Table of Contents

This page documents a task in the Entity classification and drift baseline across all components story. It captures the goal, current status, acceptance, and any notes or results.

Goal

Narrowed 2026-08-04. Originally: extend the trusted, refdata-proven tool to every remaining component, produce the full quantified drift baseline, and retire everything the tool now supersedes. The re-scoping half is done — each of the 14 ad hoc tasks was re-scoped directly against the codegen component catalogue rather than a report (see the parent story's Decisions). What remains: retire entity_coverage_matrix.org, entity_evaluation_checklist.org, and entity_catalogue.org, and decide whether the quantified classification report is still worth producing now that 12 remediation stories already exist.

Status

Field Value
State BACKLOG
Parent story Entity classification and drift baseline across all components
Now Not yet started.
Waiting on Nothing.
Next Decide whether the report is still worth producing; retire the 3 stale docs either way.
Last touched 2026-08-04

Acceptance

  • Each of the 14 ad hoc "Apply safe drift to X-cpp" tasks is closed as covered: 12 re-scoped into their own entity classification and drift baseline stories (one per component, composite components split into subcomponent tasks), 1 (ores.controller) ABANDONED as decommissioned. Done.
  • entity_coverage_matrix.org, entity_evaluation_checklist.org, and entity_catalogue.org are deleted; anything from them still useful is captured first (in the 12 stories' notes, or elsewhere).
  • (Optional) The classification tool is run across every remaining component and produces a combined drift report with per-component breakdowns and totals — only if judged still worth producing once the 12 stories close; not required to close this task if the per-component stories already supersede its value.

Plan

(Implementation strategy. Written when work starts; key decisions are distilled into the parent story's * Decisions at close, but the plan itself stays — it is the historical record of what we did.)

Notes

Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario, run through the QA Validation Runner panel) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.