Task: Scaffold story: Absorb PR checks locally

Table of Contents

This page documents a task in the Absorb PR checks locally: targeted checks, local review, CDash submissions story. It captures the goal, current status, acceptance, and any notes or results.

1. Goal

Scaffold the "Absorb PR checks locally" story into sprint 25: story doc with goal, acceptance, and out-of-scope; the initial analysis task; sprint table wiring; and the scaffold PR.

2. Status

Field Value
State DONE
Parent story Absorb PR checks locally: targeted checks, local review, CDash submissions
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-08-11

3. Acceptance

  • Story doc exists in sprint 25 with goal, acceptance, and out-of-scope.
  • The initial analysis task exists under the story.
  • The sprint 25 Product table has the story row.
  • The scaffold PR is raised, and this task is closed before it merges.

4. Plan

(Implementation strategy. Written when work starts; key decisions are distilled into the parent story's * Decisions at close, but the plan itself stays — it is the historical record of what we did.)

5. Notes

6. Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario, run through the QA Validation Runner panel) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

7. PRs

PR Title
#1954 [agile] Add story: absorb PR checks locally

8. Review

Comment summary File Decision Notes
       

9. Result

Story scaffolded into sprint 25 via PR #1954:

  • Story doc with goal, acceptance, and out-of-scope (ID 368E2B3E-CD2C-4FD5-90DD-D0E935810F4D).
  • Initial analysis task: "Analyse all CI workflows and map each check to its local equivalent" (ID 1F491E74-E4C3-4F07-9E44-4E7667A613AD), BACKLOG.
  • Sprint 25 Product table row wired.
  • Verification for the doc-only change: local site build clean (compass build –direct site).

Emacs 29.3 (Org mode 9.6.15)