Story: Sprint health review — System 2 analysis

Table of Contents

This page documents a story in Sprint 25. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

Produce recurring System 2 health reviews of sprint 25, each covering goal alignment, sprint load, PR velocity, story/task balance, focus signal, and bookkeeping hygiene. Each review is a numbered task under this story; the full analysis lives in the task's * Result and a summary row is added to sprint.org's * Health Review table.

2. Status

Field Value
State DONE
Parent sprint Sprint 25
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-09-23

3. Acceptance

  • At least one health review per sprint (mid-sprint and/or close).
  • Each review covers all six dimensions with tables and narrative.
  • Summary row added to sprint.org's * Health Review table.
  • Bookkeeping issues found are fixed or explicitly deferred.

4. Tasks

Task State Start End Description
Health review 1 — sprint 25 mid-sprint analysis DONE 2026-08-07 2026-08-07 System 2 health review 1 of sprint 25: mid-sprint check on goal alignment, load, PR velocity, story/task balance, and focus.
Health review 2 — sprint 25 close analysis DONE 2026-09-23 2026-09-23 System 2 health review 2 of sprint 25: close analysis of goal alignment, load, PR velocity, story and task balance, and focus.

5. Decisions

6. Out of scope