Task: Consolidate the WSL offload story arc into sprint 25

Table of Contents

This page documents a task in the Remote WSL offload and compute nodes story. It captures the goal, current status, acceptance, and any notes or results.

Goal

Move the WSL remote-host arc's product-backlog tasks into their correct sprint homes, so no arc work lives outside the current sprint:

  • Nine tasks move via compass task move: the compass remote-deploy tooling task (compass env deploy, PR #1937) from product_backlog/next/offload-services-to-wsl-host-cutover/ and the eight split-services tasks (container pilot, IAM healthcheck, orchestration spec, quadlet generator, controller decommission, re-scope, rollout, podman-events watcher) from product_backlog/inbox/split-services-into-per-service-containers/.
  • Seven of the split-services tasks (their work completed in sprint 24, 2026-07-29..08-02) are then routed into the sprint-24 story as history. This story keeps the tooling task, the podman-events watcher, and the new remote compute-node join task.
  • The emptied backlog stories are closed as superseded; the sprint-24 story gains a provenance note.
  • The story is wired into sprint 25 (sprint.org, under Product).

Status

Field Value
State DONE
Parent story Remote WSL offload and compute nodes
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-08-10

Acceptance

  • Tasks sit in their correct homes: the seven closed split-services tasks in the sprint-24 story, the tooling task and the podman-events watcher in this story, states preserved (7 DONE, 1 ABANDONED, 1 BLOCKED).
  • product_backlog stories carry superseded notes; the sprint-24 story carries a provenance note.
  • sprint.org lists the story under Product, state STARTED.

Plan

Notes

Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario, run through the QA Validation Runner panel) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

PRs

PR Title
#1940 [agile] Consolidate the WSL offload story arc into sprint 25

Review

# Comment summary File Decision Notes
1 Review round 1 (3 bot reviews, 5 findings): orphaned scenario doc + screenshot follow their task into the sprint-24 story; #+updated bumps on the two superseded backlog stories; stale Next on the split-services story; scaffold task still unfilled boilerplate; IAM healthcheck missing from the Goal's task list scenario_verify_controller_decommission.org, both backlog story.orgs, task_scaffold_*, task_implement_* Fixed All five fixed in one commit; replies posted and threads resolved.

Result

Nine product-backlog tasks moved into their correct sprint homes. The seven closed split-services tasks are recorded in the sprint-24 story, because their work completed in sprint 24. The sprint-24 story carries a provenance note. The compass remote-deploy tooling task and the podman-events watcher live in this story. Both product-backlog stories are closed as superseded; each carries a note pointing at this story. The remote compute-node join task was scaffolded and wired into sprint

  1. Task states were preserved through the moves: 7 DONE, 1 ABANDONED,

1 BLOCKED. The org-roam index was resynced. The site build verified the doc links.