Story: Clean ores.reporting to the component clean standard

Table of Contents

This page documents a story in Sprint 26. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

ores.reporting meets the Component Clean Standard: every item: All, Protocol and Entity pass, each item that does not apply is recorded with its reason, and ores.reporting joins COMPONENTS_UNDER_TEST. Order 27 of 35 in the sprint 26 component clean-up, tier 3 (domain component).

The clean-standard pass ran here, and the defects and gaps it recorded and did not close split to Complete the ores.reporting clean-up at the sprint 26 close on 2026-10-05.

2. Status

Field Value
State DONE
Parent sprint Sprint 26
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-05

On 2026-10-05, at the sprint 26 close, this story was reworded to the clean-standard pass it delivered and closed DONE: the checklist record is complete, G08 and H03 are fixed, V08 is closed, and ores.reporting is listed in COMPONENTS_UNDER_TEST. The recorded defects and gaps are Complete the ores.reporting clean-up, and its seven tasks moved there.

3. Acceptance

  • The checklist items that apply to a component of kind Entity pass, except the items Complete the ores.reporting clean-up carries: the report_definitions shell menu collision, P01, S01, G04, H01, M04, M08 and V04's remaining causes, each with its evidence recorded on the task.
  • Every item that does not apply is recorded as not applicable, with the reason.
  • Every generator defect the pass closed is fixed at its source, with a regression test; the shared template defects it recorded are carried by the successor story.
  • ores.reporting is listed in COMPONENTS_UNDER_TEST, and check_component_drift.py --all passes.

4. Tasks

Task State Start End Description
Bring ores.reporting to the clean standard DONE 2026-09-26 2026-09-27 Work ores.reporting through the Component Clean Standard in order and record each item.
Make the scheduler-triggered report execution correct DONE 2026-09-26 2026-09-27 Determine how much of the report instance FSM and the report execution workflow is actually implemented, and make the scheduler-to-report trigger path work end to end.
Close the ores.reporting checklist DONE 2026-09-27 2026-09-27 Task for: Clean ores.reporting to the component clean standard
Scaffold the remaining ores.reporting clean-up DONE   2026-09-27 Task for: Clean ores.reporting to the component clean standard

5. Notes

  • Survey on 2026-09-23: 5 entity, junction or operation models; 163 C++ files outside tests, 127 of them generated (77%); 28 messaging headers, 8 of them hand-written.

6. Decisions