Task: Health review 1 — sprint 26 close analysis

Table of Contents

This page documents a task in the Sprint health review — System 2 analysis story. It captures the goal, current status, acceptance, and any notes or results.

1. Goal

A System 2 health review of sprint 26 at its close: the six dimensions measured and challenged, the bookkeeping repaired, the sprawling stories reworked and split, and one overall verdict with the evidence behind it.

2. Status

Field Value
State DONE
Parent story Sprint health review — System 2 analysis
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-05

3. Acceptance

  • Every number the review states is a measurement with the command that produced it and the commit it was taken at, or is marked as an estimate with its basis.
  • Every dimension the skill names — goal alignment, sprint load, PR velocity, story and task balance, focus signal and velocity — carries a verdict and the evidence behind it, and the overall verdict follows the skill's RAG rule.
  • Every sprawling story is reworked and split, or carried STARTED with its reason recorded; every DONE task carries its branch, its PR row and Nothing. in Now, Waiting on and Next, and the audit's remaining findings are recorded with their reason.
  • The sprint's * Health Review table carries the summary row.

4. Plan

  1. Branch feature/sprint-26-health-review-1 from main and scaffold the review story and its task.
  2. Gather the six dimensions: read the sprint, its stories and its tasks; measure the commit load, the PR velocity and the census; regenerate the four charts.
  3. Challenge every reading with the skill's System 2 questions.
  4. Apply the close policy: rework each sprawling story to the scope it delivered, close it DONE, and move its remainder to a new story. Carry a story STARTED only when its remainder is small and a split does not fit.
  5. Repair the bookkeeping drift the shape pass and the audit surface.
  6. Write the Result, add the sprint's summary row, close the story and the task, and raise the PR.

5. Measurements

Every number this task claims about a tree, with the command that produced it and the commit it was measured at. A number without both is not a measurement, because a clean-up record describes a tree and trunk moves under a branch: a consumer count, a gate's component count and a suite's size all change with no code changing, and the reader of a bare number cannot tell which tree it came from. Where the raw output matters, put it in an evidence/ file beside the task and name that file in the Command column.

What Value Command Commit
Commits since 2026-09-23 3921 git log --oneline --since=2026-09-23, counted ac422ea148
Commits per day 95, 1, 0, 1018, 644, 307, 370, 268, 305, 224, 265, 301, 123 git log --since=2026-09-23 --format=%ad --date=short, grouped by day ac422ea148
Merged PRs since 2026-09-23 519 gh pr list --state merged --search "merged:>=2026-09-23" --limit 1000 ac422ea148
PR cycle times median 0.3 h, p90 3.9 h, max 24.9 h build/output/sprint_26/pr_cycle_times.csv, written by compass sprint charts ac422ea148
Stories by state 126: 95 DONE, 14 STARTED, 16 BACKLOG, 1 ABANDONED State histogram over doc/agile/versions/v0/sprint_26/**/story.org ac422ea148
Tasks by state 482: 368 DONE, 90 BACKLOG, 15 DISCOVERED, 5 STARTED, 1 BLOCKED, 3 ABANDONED State histogram over doc/agile/versions/v0/sprint_26/**/task_*.org ac422ea148
Audit findings 58: 6 open tasks with merged PRs, 52 closed documents with prose in Now ./compass.sh sprint audit, saved in evidence/sprint_audit_2026-10-05.txt ac422ea148

6. Notes

7. Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

8. PRs

PR Title
#2654 [agile] Sprint 26 health review 1 — RED

9. Review

PR #2654, comment 5993658629 (the on-demand @claude review).

# Comment summary File Decision Notes
1 _table_bounds finds the heading with startswith("* Tasks"), which also matches * Tasks and notes projects/ores.compass/src/compass.py Accept The match is now the exact heading or the heading plus a space, so a lookalike such as * Tasks: notes no longer matches. test_a_lookalike_heading_is_not_the_tasks_table covers it. The reviewer's own note that a missing table now returns None is the intended, safer behaviour.
2 A hard-coded cap in _sc_get_merged_prs will truncate silently again; warn when the result length equals the limit projects/ores.compass/src/compass.py Accept A warning now names the truncated data when the list reaches 1000. The same class of defect had already truncated the release-notes collector at 500 against 516 PRs merged since the v0.0.25 tag; its cap is raised to 1000 with the same warning.
3 The regression test does not cover the placeholder-row restore path when the last row is removed projects/ores.compass/tests/test_task_move_row_scope.py Accept test_restores_the_placeholder_when_the_last_row_is_removed added; the file now runs three tests, all passing.
4 #+environment differs per new story (bright_faraday, eager_maxwell, solid_dirac) against the PR's brave_hopper the successor stories Decline Intentional: the field records the worktree that minted the document, and the three successors were minted in other worktrees during earlier sessions.
5 Confirm the three other regenerated charts are committed, since only line_churn.png appeared in the file list doc/agile/versions/v0/sprint_26/*.png Accept Verified: git diff --name-status shows all four added by this PR — line_churn.png, pr_cycle.png, prs_commits.png and stories_done.png.

10. Result

10.1. Review on 2026-10-05 (day 13 of 7)

Sprint 26 was scheduled from 2026-09-23 to 2026-09-30. This review runs on 2026-10-05, day thirteen, and the sprint is still in flight. Every number below is a measurement at ac422ea148 plus this branch's own document changes; the command that produced each one is in * Measurements.

10.1.1. Goal alignment

The mission has three passes, run in order: sync codegen and clear drift, analyse the user journeys, then build the UX. All three have real work, and none is uncovered.

Goal Coverage Stories (DONE / STARTED / BACKLOG) Verdict
Sync codegen and clear drift The clean-standard programme and its component stories. Four components are still in flight (dq, scheduler, reporting, synthetic) and three wait in the backlog (diff, eventing, history). The marketdata story is DONE, but the component stays outside COMPONENTS_UNDER_TEST until its three remaining items close. 26 / 4 / 3, 1 abandoned AMBER
Analyse the user journeys The extraction programme, with 3 of its 16 tasks done. Journey documents were also written and re-verified inside the UX group stories. 0 / 1 / 0 AMBER
Build the UX The five journey groups of ores.web are DONE. The record screens, the operations journeys and the refdata journeys are in flight. 5 / 3 / 1 AMBER

Verdict AMBER: each goal advanced, and each still holds an open remainder.

10.1.2. Sprint load

Metric Value Target Status
Commits since 2026-09-23 3921 ≤ 1000 for the sprint RED
Commits per day 95, 1, 0, 1018, 644, 307, 370, 268, 305, 224, 265, 301, 123 — —
Average ≈ 302 per day over 13 days ≤ 143 per day (1000 over 7) RED
Window day 13 of a planned 7 7 days RED

The tree carries about four times the commit ceiling. The load is uneven: two near-idle days (2026-09-24 and 09-25) sit before a burst of 1018 commits on 09-26. After the burst the rate never falls below 123 commits on an active day. This is the shape of an overrun sprint, not of a stall: work continued on every day to the review.

10.1.3. PR velocity

Metric Value Notes
Merged PRs since 2026-09-23 519 The sprint's target band is 100–120: 4.3 to 5.2 times it.
Merge cycle median 0.3 h, p90 3.9 h, max 24.9 h build/output/sprint_26/pr_cycle_times.csv
Open PRs 2 (#2646, #2644) Both raised on 2026-10-05, hours before this review.
Long-open WIP none No pull request waited more than a day for its merge.

Verdict RED: the velocity is the load's twin. The sprint merged about five times the planned PR count, and no WIP piled up. A merged pull request never sat waiting.

10.1.4. Story and task balance

Metric Value Notes
Stories 126: 95 DONE, 14 STARTED, 16 BACKLOG, 1 ABANDONED After the rework-and-split below.
DONE : open 95 : 30 ≈ 3.2 The skill's line is 0.5.
Tasks 482: 368 DONE, 90 BACKLOG, 15 DISCOVERED, 5 STARTED, 1 BLOCKED, 3 ABANDONED  
Undecomposed stories 5 BACKLOG with zero tasks: the work is opaque until decomposed.

The five undecomposed stories:

Verdict AMBER: the ratio is comfortably green, but five backlog stories carry no tasks at all, so no one can see their shape.

10.1.5. Focus signal

Metric Value Verdict
STARTED stories 14 RED: the skill's red line is 6.
Before the split 18 The review closed four (below).
Themes clean standards (4), journeys and UX (4), reporting and compute (3), shell and Qt removal (2), workflow (1) Mixed.

The fourteen in flight: clean-dq, clean-reporting, clean-scheduler, clean-synthetic, extract-user-journeys, exercise-workflow, full-report-pipeline, acme-report-grid-smoke-test, build_approvals_and_notifications, implement-operations-journeys, implement_refdata_journeys, standardise_the_record_screens, remove_the_legacy_qt_remnants and pattern_language_for_service_interaction.

Verdict RED: fourteen stories in flight across five themes. The split cut the count from eighteen, and each carried story now holds a small, honest remainder, but the sprint still closes with fourteen open fronts.

10.1.6. Velocity

Metric Value Notes
Stories closed 95 of 126 75%.
Tasks closed 368 of 482 76%.
Commits 3921 In 13 days.
PRs merged 519  
Window day 13 of 7 The sprint overran its planned window.

Verdict AMBER: throughput was high and converged to the last day — 123 commits and two fresh pull requests on the review day — but the sprint closes with a quarter of its stories and tasks open, after running to nearly twice its planned length.

10.1.7. The rework-and-split (executed at this review)

The close policy: rework and split is the default. When a story has delivered a large part of its scope, reword the story and its acceptance to the work that shipped, close it DONE, and give the remainder a new, more focused story. Carry a story STARTED only when its remainder is small and a split does not make sense.

Source (reworded and closed DONE) Successor (new, BACKLOG) Tasks moved
Model the ORE report configuration as entities Complete the ORE report configuration 22
Rewrite the oresmd grammar as a hand-written codec checked against ORE Return marketdata to the clean-standard registry 2
Implement the access journeys in ores.web Land the role request journey 1
Generate the shell surface of the clean components Default the shell facet on at the profile level 1

Each source story now states what it delivered, and its traceability paragraph names its successor. The other fourteen STARTED stories were carried, each with its small remainder.

10.1.8. Bookkeeping repairs

  • 62 DONE tasks brought to shape: #+branch: and #+pr: where missing, a * PRs row where missing, and 37 Waiting on and Next cells cleared to exactly Nothing.
  • 5 hotfix story files repaired from a literal +#+ prefix.
  • 9 sprint.org rows fixed to the table's shape.
  • The compass task move row-scope defect found while splitting: it matched a task's link in a Status Next cell before the * Tasks row. Fixed in compass.py, with a regression test (test_task_move_row_scope.py, 1 passed). The one move it damaged (task 859762E0) was repaired in both stories, and the stale row it left in the access story was deleted.
  • Task 49B3C660's invalid State IN PROGRESS repaired to STARTED.
  • The merged-PR chart fetch fixed (--limit 1000) and the four charts regenerated.
  • The duplicate scan over the sprint's stories found no duplicates.
  • 366 local branches of merged pull requests deleted. Five branches stay because other worktrees hold them: feature/add-the-pattern-document-type-and-hub (bright_faraday), feature/close-the-marketdata-test-coverage (prime_origin), feature/generate-the-remaining-shell-surfaces (solid_dirac), feature/implement-access-journeys (swift_curie) and feature/rename-the-anchor-to-trade (merry_newton).

10.1.9. Audit record

./compass.sh sprint audit at ac422ea148: 58 findings, saved in full beside this task in evidence/sprint_audit_2026-10-05.txt.

  • 6 open tasks whose pull requests have all merged. The audit flags a task that stays open while every pull request it names is merged. Each was read: all six are genuinely open, and each names its remainder.
    1. Model the handcrafted ores.dq code and generate the artefact tables (686E9BB0, clean dq)
    2. Bring ores.scheduler to the clean standard (49B3C660)
    3. Bring ores.synthetic to the clean standard (8063C1A9)
    4. Default the shell facet on at the profile level (9B53C333, BLOCKED; now in the successor story)
    5. Add the identity workflow and the commands that drive it (0442FD13)
    6. Remove the presentation keys no template reads (54AEFA10)
  • 52 closed documents whose Now is not exactly Nothing. The audit wants the bare word. Each holds its close prose: "All tasks done.", "Merged as <sha>.", or a summary of the result. That prose is the historical record, so this review records the drift and does not rewrite it.

The documents this review closed — the four reworked source stories, this task and its story — carry exactly Nothing. in Now, Waiting on and Next, so none of them appears in either list.

10.1.10. Overall verdict

Dimension Verdict
Goal alignment AMBER
Sprint load RED
PR velocity RED
Story and task balance AMBER
Focus signal RED
Velocity AMBER
Overall RED

Sprint 26 does not have a stalling problem; it has a scale problem. It carried about four times the commit ceiling and about five times the PR band, and it ran to day thirteen of a planned seven. All three goals advanced, but fourteen stories are still in flight and five backlog stories carry no tasks. The widest fix, the rework-and-split, is now executed: four sprawling stories became honest DONE records with named successors. Lowering the STARTED count further, one story at a time, is the next lever. Sprint load and PR velocity are RED together, so the overall verdict is RED.

10.1.11. The close (2026-10-05)

The review ran at the sprint's close, and the close itself landed on this same branch. What the close changed, read against the review above:

  • The four rework-and-splits this review executed mid-analysis were joined by seven more: eleven stories closed DONE at the scope they delivered, each reworded so its Goal and Acceptance describe only what shipped, with its remainder in a successor story in the product backlog inbox.
  • The nineteen other open stories were carried whole to the inbox by file move, identifiers intact. The sprint table marks each of their rows ABANDONED with the close date, and the fourteen STARTED stories it names are no longer open fronts: none of them starts sprint 27 in flight.
  • The sprint table's 127 rows now read 107 DONE and 20 ABANDONED — the last DONE row is this review's own story, which the table did not carry — and the sprint carries its achievements, its retrospective and its release notes.
  • The 51 closed documents this review recorded as carrying prose in Now were repaired: the prose moved to * Result and Now set to exactly Nothing.. compass sprint audit reports no findings.
  • release_notes.org was generated from the 519 merged PRs and edited into the sprint's record; version.org records the sprint as closed.
  • Four pull requests merged while the close branch was open: #2652, the approvals and notifications service; #2644, the currency, desk group and currency pair screens; #2655, the split of my profile from the People screens; and #2646, the holiday calendar screen, which completed the refdata journeys story and retired the successor it had been given. The close absorbed their seven closed tasks back into the sprint's stories and reworded those stories and their successors to record the completions.

The verdict stands: the sprint was RED on load and velocity, and the close does not change that. It records it honestly instead.