Story: Catch the generated artefacts up, and fix a dangling id link
Table of Contents
This page documents a story in Sprint 27. It captures the goal, current status, acceptance criteria, and the tasks that compose it.
1. Goal
Four local checks fail on main and none of them is a branch's fault, so every branch inherits a red gate. Catch the tree back up: regenerate the two artefacts whose sources moved, and fix the link that breaks the site build.
2. Status
| Field | Value |
|---|---|
| State | DONE |
| Parent sprint | Sprint 27 |
| Now | Nothing. |
| Waiting on | Nothing. |
| Next | Nothing. |
| Last touched | 2026-10-08 |
3. Acceptance
- The shell library tangles to exactly what is committed.
- The committed ER diagram matches the schema.
- No document links an id that no document defines.
4. Tasks
| Task | State | Start | End | Description |
|---|---|---|---|---|
| Scaffold story: Catch the generated artefacts up, and fix a dangling id link | DONE | 2026-10-08 | 2026-10-08 | Story scaffolding rides this task: documents, sprint wiring, and the scaffold PR. Close it before merging that PR. |
| Regenerate the stale artefacts | DONE | 2026-10-08 | Initial task for: Catch the generated artefacts up, and fix a dangling id link |