1. Goal

Land the story that owns the Operations journey group: the story page, the six tasks, the sprint row and the programme's order table. The design is already accepted — the five journeys and the throwaway prototype carry it — and this task does not touch the journey documents.

2. Status

Field Value
State DONE
Parent story Implement the operations journeys in ores.web
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-04

3. Acceptance

  • The story exists in Sprint 26, and the sprint's * Stories table links it.
  • The programme story's order table names this story against the Operations group.
  • The six tasks are wired into the story's * Tasks table: the five data-model linkages are one task each, and the screens build is one task.
  • The story names the accepted prototype branch as its design record and states that the prototype is ported, not merged.
  • compass lint passes and the pages publish.

4. Plan

  1. Scaffold the story with compass story new.
  2. Write the goal, the acceptance, the plan, the decisions, the out-of-scope list and the documents.
  3. Scaffold the six tasks with compass task new, so each one is wired into the story's * Tasks table.
  4. Wire the story into the sprint's * Stories table, and into the programme's order table.
  5. Raise the scaffold PR. The six tasks stay BACKLOG until the PR merges.

5. Measurements

Every number this task claims about a tree, with the command that produced it and the commit it was measured at. A number without both is not a measurement, because a clean-up record describes a tree and trunk moves under a branch: a consumer count, a gate's component count and a suite's size all change with no code changing, and the reader of a bare number cannot tell which tree it came from. Where the raw output matters, put it in an evidence/ file beside the task and name that file in the Command column.

What Value Command Commit
Operations journeys in the catalogue 5 ls doc/knowledge/journeys/operations/journey_*.org 00b369b9d7
Groups in the journey catalogue 9 ls -d doc/knowledge/journeys/*/ 00b369b9d7
Data-model captures the record filed 5 git show --name-only --format 7d61b3ba7e – doc/agile/product_backlog/inbox/= 00b369b9d7

6. Notes

  • The group is the ninth in Implement the user journeys in ores.web, after Tenancy. It was the catalogue's last group written, and it is the only one whose design arrived settled: the five journeys were written and walked against a clickable prototype in sprint 26, and the user accepted the walk on 2026-10-04.
  • The prototype branch prototype/operations-journeys at 285519db99 is the design record and never merges. Each journey names the branch and its route under * Prototype.
  • The five captures the walk filed are the story's first tasks: the heartbeat host (A1D7FC12), the roster read (B7B53CD1), the login-answer database (B7AE6C4F), the grid read's scope (3621E2BC) and the node summary's failure fields (8C1D6E61).
  • The journey documents are fresh — written on 2026-10-04 against this tree — so no survey task precedes the build: each task re-checks its own claims as it works.
  • The tree at the branch point already carries the journey runtime from the Setup group (projects/ores.web/packages/web/src/journeys/runtime.ts).
  • The shell already carries one operations read: compute grid-stats and its recipe at projects/ores.shell/scripts/library/compute/, so the grid tasks verify the shell side as they change the read.

7. Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

8. PRs

PR Title
2622 [agile] Scaffold the operations journeys story

9. Review

# Comment summary File Decision Notes
1 Next names one task although the five data-model linkages have no fixed order story.org Fixed Next now says the five run in any order, and the heartbeat task is one of them.
2 The sprint row and the story dates agree although both were written the same day sprint.org No change The review found them consistent.
3 The task pages keep the empty template sections the six task pages No change Normal for a scaffold; each Plan fills in when its task starts.
4 Row 9 could read as a dependency order story.org No change The note paragraph under the order table explains the row placements.

10. Result

Done 2026-10-04. PR #2622.

The Operations group has a story, six tasks, a row in sprint 26 and a row in the programme's order table:

Artefact Id
Story: Implement the operations journeys in ores.web 435E6F02-C2AF-4C2B-BB56-654A86A424A7
Task: Carry the host on the heartbeat BAE5860D-49CF-4063-A63A-76DA8AFAB166
Task: Serve the services roster D495FB06-E711-4DCB-A4C6-2E4722FF973F
Task: Carry the database on the login answer 9B13FEDD-E6E5-43F2-B7A9-DF5BEF9230A7
Task: Read the whole grid E3FF9B97-A7F5-494F-BECE-DBB8910244C6
Task: Keep the failure fields on the node summary 4DC1AFB6-F687-4314-A5B3-C7A786A93F57
Task: Build the operations screens in ores.web 5E83118A-1342-4088-B371-3367EF63FF17

Two facts were checked while scaffolding, and both are recorded on the story:

  • The five journey documents are fresh. They were written and accepted against this tree on 2026-10-04, so no survey task precedes the build, and each task re-checks its own claims as it works.
  • Both clients' starting points exist on the tree. The journey runtime is already there (projects/ores.web/packages/web/src/journeys/runtime.ts, landed by the Setup group), and the shell already carries one operations read: compute grid-stats and its recipe under projects/ores.shell/scripts/library/compute/.

The sprint's * Stories row needed one hand-edit: compass story new left it at BACKLOG while the story opened STARTED. The row states STARTED with 2026-10-04 as its start.

Verification: compass lint passes on this branch (filetags and generator markers valid; the durable-document link advisory stands at 224 links across 105 files). compass site page rebuilt 19 page(s) with 0 failure(s). The story row was read back from the sprint's * Stories table, and its six tasks were wired into its * Tasks table by compass task new.