Story: Reconcile the sprint's bookkeeping

Table of Contents

This page documents a story in Sprint 27. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

Take the sprint audit from 41 findings to the two that are real open work, and lose no record doing it.

2. Status

Field Value
State DONE
Parent sprint Sprint 27
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-09

3. Acceptance

  • One story and six tasks that had finished are closed.
  • No sprint table row disagrees with its story file.
  • No closed document carries a Now other than Nothing., and no outcome text is lost.
  • What stays open is open on purpose and says why.

4. Tasks

Task State Start End Description
Scaffold story: Reconcile the sprint's bookkeeping DONE 2026-10-09 2026-10-09 Story scaffolding rides this task: documents, sprint wiring, and the scaffold PR. Close it before merging that PR.
Implement Reconcile the sprint's bookkeeping DONE   2026-10-09 Initial task for: Reconcile the sprint's bookkeeping

5. Decisions

  • A merged pull request does not close a task by itself. Two of the eight the audit flagged are not finished. Bring ores.synthetic to the clean standard waits on five open items (B06, V08, M06, P03, V04) and on a decision to accept any of them as an exception, and Split every codegen template org into commented literate blocks is BLOCKED behind the refdata entity model drift. Both are left open, and the audit's merged-PR rule is what produced the false positives.
  • The story file is the record and the table is a view. Where the two disagreed, the table was moved to match the story file. Five rows were edited directly because compass has no verb that starts a story, only story done.
  • A closed document's outcome moves to its Result before its Now is blanked. Six of the twenty-five closed documents had no Result at all, so their Now held the only record. Blanking those would have destroyed it.

6. Out of scope

  • The two findings left open. They need their owners, not a bookkeeping pass.

7. Result

Done. The audit reports two findings, both deliberate: the synthetic clean-up task that still has five open items, and the blocked literate-blocks task. One story and six tasks were closed, five sprint rows were reconciled, and twenty-five closed documents had their outcome moved into a Result before their Now was blanked.