Story: Repair the drifted artefacts on main
Table of Contents
This page documents a story in Sprint 27. It captures the goal, current status, acceptance criteria, and the tasks that compose it.
1. Goal
The ores.web workspace is prettier-formatted, so the TypeScript workflow passes on main again.
2. Status
| Field | Value |
|---|---|
| State | DONE |
| Parent sprint | Sprint 27 |
| Now | Nothing. |
| Waiting on | Nothing. |
| Next | Nothing. |
| Last touched | 2026-10-08 |
3. Acceptance
- prettier –check passes for the ores.web workspace.
- The local check gate passes for the hotfix branch.
4. Tasks
| Task | State | Start | End | Description |
|---|---|---|---|---|
| Scaffold story: Repair the drifted artefacts on main | DONE | 2026-10-08 | 2026-10-08 | Story scaffolding rides this task: documents, sprint wiring, and the scaffold PR. Close it before merging that PR. |
| Repair the drifted artefacts | DONE | 2026-10-08 | Initial task for: Repair the drifted artefacts on main |
5. Decisions
6. Out of scope
- The ER diagram, which was already up to date when work started.
7. Result
One file, packages/web/src/access/MyAccessPage.tsx, is prettier-formatted,
so the TypeScript workflow passes on main again. The local check gate
passed for the hotfix branch.