Story: Add entity groups and finish the remaining codegen work
Table of Contents
This page documents a story in Sprint 28. It captures the goal, current status, acceptance criteria, and the tasks that compose it.
1. Goal
Add an entity group annotation to the model and a group flag to codegen, and finish the remaining codegen work: the model drift fixes, the counterparty logo picker and the tenor convention messaging layer under codegen, and the literate template split.
2. Status
| Field | Value |
|---|---|
| State | DONE |
| Parent sprint | Sprint 28 |
| Now | Nothing. |
| Waiting on | Nothing. |
| Next | Nothing. |
| Last touched | 2026-10-24 |
3. Acceptance
The story closes on the tasks it finished:
- Make the umbrella header a permanent artefact.
- Mop up the codegen snags the parts guard left.
4. Tasks
| Task | State | Start | End | Description |
|---|---|---|---|---|
| Make the umbrella header a permanent artefact | DONE | 2026-10-16 | Salvaged from the retired branch feature/codegen-improvements: land the umbrella-header restructure, which already exists as a clean cherry-pick of 875df5ff79 on branch feature/codegen-umbrella-headers. The umbrella header sits in the disabled ores.cpp.scaffold facet, so no regeneration emits it and no gate covers it; 46 copies survive in the tree, stale. | |
| Mop up the codegen snags the parts guard left | DONE | 2026-10-16 | 2026-10-17 | The parts now generate their presence files, but not their CMake: generate.py holds the graph off every ores.cmake.* facet for a sub-component project, because 93 of the 94 checked-in src/CMakeLists.txt diverge from the template baseline and regenerating one deletes behaviour. The same shape leaves ores.geo's hand-migrated CMake and ores.history/api's hand-written header-only INTERFACE library reconciling against templates that no longer match them. Sources: the captures bring-the-part-cmake-link-lists-under-the-model and reconcile-the-generated-files-main-hand-edited. |
5. Decisions
- Closed at sprint 28 close with its 2 done tasks. The 11 open tasks and the original acceptance moved to Add entity groups and finish the remaining codegen work — the remaining work in the product backlog inbox.