Story: Close the tenor journey and the remaining refdata gaps

Table of Contents

This page documents a story in Sprint 28. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

The tenor resolution journey and the remaining refdata gaps are built: the tenor resolve operation and its screen, party membership versions, the convention family mapping and term rules, the portfolio right key, the Acme book-control actors, and the party list and history reads.

2. Status

Field Value
State DONE
Parent sprint Sprint 28
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-24

3. Acceptance

The story closes on the tasks it finished:

  • Build the tenor resolution screen.
  • Resolve a tenor over the wire, with the refusal it carries.
  • Build the pure batch tenor resolution engine.

4. Tasks

Task State Start End Description
Build the tenor resolution screen DONE 2026-10-15 2026-10-15 Build journey 9 in ores.web from its document and prototype: the tenor list, the tenor, its convention, the schedule, the resolved dates, the review, the refusal and the history.. Journeys 9.
Resolve a tenor over the wire, with the refusal it carries DONE 2026-10-16 2026-10-17 Add the resolve operation journey 9 draws in two places, and the refusal payload its failures should carry instead of a thrown exception reaching the screen as a 500.
Build the pure batch tenor resolution engine DONE 2026-10-16 2026-10-16 Task for: Close the tenor journey and the remaining refdata gaps

5. Decisions

  • Closed at sprint 28 close with its 3 done tasks. The 7 open tasks and the original acceptance moved to Close the tenor journey and the remaining refdata gaps — the remaining work in the product backlog inbox.
  • The tenor resolution screen is its own screen, reached from its own card at /refdata/tenors, and not a step inside the instrument-convention journey. Tenors are their own reference-data job.
  • A tenor and the convention that resolves it are one rail, because they are read together and the review draws one difference list over both. The convention is not a second journey.
  • The confirm is a sequence of writes rather than one write, and a refusal names the step that refused and the calls already written. A person has to be able to see what landed.
  • The resolved dates, and a schedule axis expanded into dated rolls, wait on one operation the server does not serve yet: resolving a tenor to a date. Both are carried by Resolve a tenor over the wire, with the refusal it carries.
  • Every word the screen draws comes from the catalogue. The journey's state module names its changes and its problems by key, never in English.

6. Out of scope