Story: Hotfix: fix the main CI failures
Table of Contents
This page documents a story in Sprint 28. It captures the goal, current status, acceptance criteria, and the tasks that compose it.
1. Goal
Four CI failures on main: range-loop-construct error in xml_document_tests.cpp (gcc), incomplete component_trade type in deque on windows-msvc, workflow_engine_tests SIGABRT (std::system_error Invalid argument), and the site build broken link to ID 465ca244 in the time-series plot capture.
2. Status
| Field | Value |
|---|---|
| State | DONE |
| Parent sprint | Sprint 28 |
| Now | Nothing. |
| Waiting on | Nothing. |
| Next | Nothing. |
| Last touched | 2026-10-20 |
3. Acceptance
4. Tasks
| Task | State | Start | End | Description |
|---|---|---|---|---|
| Scaffold story: Hotfix: fix the main CI failures | DONE | 2026-10-20 | 2026-10-20 | Story scaffolding rides this task: documents, sprint wiring, and the scaffold PR. Close it before merging that PR. |
| Implement Hotfix: fix the main CI failures | DONE | 2026-10-20 | Initial task for: Hotfix: fix the main CI failures |