1. Goal
The story and its three tasks exist in sprint 28 with their branches and dependencies recorded, and this branch carries the scaffold commit that opens the PR.
2. Status
| Field | Value |
|---|---|
| State | DONE |
| Parent story | Fix the tenor basis swap convention model and the document TU |
| Now | Nothing. |
| Waiting on | Nothing. |
| Next | Nothing. |
| Last touched | 2026-10-14 |
3. Acceptance
- The story and its three tasks are wired into the sprint and the story tables, and compass lint passes.
- The scaffold PR carries the story, the tasks and the commit, and is merged into main.
4. Plan
(Implementation strategy. Written when work starts; key decisions
are distilled into the parent story's * Decisions at close, but the
plan itself stays — it is the historical record of what we did.)
5. Measurements
Every number this task claims about a tree, with the command that produced it
and the commit it was measured at. A number without both is not a measurement,
because a clean-up record describes a tree and trunk moves under a branch: a
consumer count, a gate's component count and a suite's size all change with no
code changing, and the reader of a bare number cannot tell which tree it came
from. Where the raw output matters, put it in an evidence/ file beside the
task and name that file in the Command column.
| What | Value | Command | Commit |
|---|---|---|---|
6. Notes
7. Test Scenarios
Manual QA scenarios (scaffolded via compass add test_scenario)
that verify this task. Link
new ones here as they're created; the scenario doc itself links back
via its "Verifies task" field.
| Scenario | State | Notes |
|---|---|---|
8. PRs
| PR | Title |
|---|---|
| #3278 | [agile] Scaffold the tenor basis swap convention model story |
9. Review
| Comment summary | File | Decision | Notes |
|---|---|---|---|
10. Result
The story and its three tasks are in sprint 28 and wired into the sprint and story tables. Each task records the feature branch it will be worked on, and the protocol split waits on the investigation.
compass check classified the branch as the docs class and passed 6/6
checks: site-page, lint, org-links, structure-notes, pattern-uses and
prototypes. No C++ was built, because the change touches org documents