Task: Open sprint 28

Table of Contents

This page documents a task in the Open sprint 28 story. It captures the goal, current status, acceptance, and any notes or results.

1. Goal

Sprint 28 exists as an agile artefact, wired into the version manifest and the agile index, and the project version carries 0.0.28.

2. Status

Field Value
State DONE
Parent story Open sprint 28
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-13

3. Acceptance

  • Sprint 28 is scaffolded under version 0 with its mission, and linked from the version manifest and the agile index.
  • The sprint-open story and task exist and are wired into the sprint.
  • The project version is 0.0.28 in CMakeLists.txt, vcpkg.json, the three workflow package names, the readme badges and the readme and index screenshots.
  • The vcpkg submodule points at the latest master.

4. Plan

(Implementation strategy. Written when work starts; key decisions are distilled into the parent story's * Decisions at close, but the plan itself stays — it is the historical record of what we did.)

5. Measurements

Every number this task claims about a tree, with the command that produced it and the commit it was measured at. A number without both is not a measurement, because a clean-up record describes a tree and trunk moves under a branch: a consumer count, a gate's component count and a suite's size all change with no code changing, and the reader of a bare number cannot tell which tree it came from. Where the raw output matters, put it in an evidence/ file beside the task and name that file in the Command column.

What Value Command Commit
Project version 0.0.28 grep "project(OreStudio VERSION" CMakeLists.txt 64b3d9fd7d
Remaining 0.0.27 references 2: the commits-since badge and the v0.0.27 screenshot grep -rn "0\.0\.27" CMakeLists.txt vcpkg.json .github/workflows readme.org index.org 64b3d9fd7d
vcpkg pin e456309491 git submodule status vcpkg 181628a4e0

6. Notes

7. Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

8. PRs

PR Title
#3272 [agile] Open sprint 28

9. Review

Comment summary File Decision Notes
       

10. Result

10.1. Sprint 28 is open (2026-10-13)

Sprint 28 was scaffolded under version 0 with the mission to finish the record screens and the journey remainders carried from sprint 27, with fewer stories in flight. It links back to sprint 27 and forward from the version manifest and the agile index, which now names sprint 28 current and sprint 29 next.

The project version is 0.0.28 across all six carriers: CMakeLists.txt, vcpkg.json, the three workflow package names, the readme badges and the readme and index screenshots. The readme now shows the just-released v0.0.27 screenshot, and the only 0.0.27 references left are the commits-since badge and that screenshot, both intended. The vcpkg submodule moved to e456309491.

The same branch also refreshed the sprint 27 release notes. The generator gained a Hotfixes section and a ten-section scored taxonomy, and it no longer lists non-DONE stories under Key Improvements. The sprint 27 entries were regrouped by hand: thirty hotfixes together, the twenty-two carried stories removed from the improvements, and no catch-all Other bucket. The draft GitHub release for v0.0.27 was updated from the corrected notes.

Sprint 28 starts with no stories: pulling carried work back from the product backlog is the planning step, not part of opening the sprint.