Task: Populate sprint 28 with the carried stories

Table of Contents

This page documents a task in the Populate sprint 28 with the carried stories story. It captures the goal, current status, acceptance, and any notes or results.

1. Goal

Sprint 28 holds the 41 stories carried from sprint 27 — its 21 unfinished stories and the 20 successors their remainders were split into — instead of leaving them in the product backlog inbox.

2. Status

Field Value
State DONE
Parent story Populate sprint 28 with the carried stories
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-13

3. Acceptance

  • Every sprint 27 carry and successor moves out of the inbox into sprint 28, with its ID, tasks and history intact.
  • Each moved story names sprint 28 as its parent and carries the sprint_28 tag.
  • The sprint's * Stories table lists every moved story.

4. Plan

(Implementation strategy. Written when work starts; key decisions are distilled into the parent story's * Decisions at close, but the plan itself stays — it is the historical record of what we did.)

5. Measurements

Every number this task claims about a tree, with the command that produced it and the commit it was measured at. A number without both is not a measurement, because a clean-up record describes a tree and trunk moves under a branch: a consumer count, a gate's component count and a suite's size all change with no code changing, and the reader of a bare number cannot tell which tree it came from. Where the raw output matters, put it in an evidence/ file beside the task and name that file in the Command column.

What Value Command Commit
       

6. Notes

7. Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

8. PRs

PR Title
#3274 [agile] Populate sprint 28 with the sprint 27 carries

9. Review

Comment summary File Decision Notes
       

10. Result

10.1. Sprint 28 populated (2026-10-13)

The 41 stories sprint 27 carried into the product backlog — its 21 unfinished stories and the 20 successors their remainders were split into — moved back into sprint 28. Each kept its UUID, its task files and its history; each now names sprint 28 as its parent sprint and carries the sprint_28 tag instead of the inbox tags. The sprint's * Stories table lists all 41.

Thirteen story folders stay in the inbox: ten carried from sprint 26 and three older ones. They are out of this sprint's mission, which is the record screens and the journey remainders carried from sprint 27.

compass sprint audit reports nine findings: one story ready to close and the eight open tasks whose pull requests have all merged, all of them the carried work sprint 27's review already recorded. They are the planning input.

Emacs 29.3 (Org mode 9.6.15)