Task: Scaffold story: Trace a process run and the trade groups it creates

Table of Contents

This page documents a task in the Trace a process run and the trade groups it creates story. It captures the goal, current status, acceptance, and any notes or results.

1. Goal

Scaffold the story, wire it into Sprint 27, and move the run tasks into it from the trade activities story.

2. Status

Field Value
State DONE
Parent story Trace a process run and the trade groups it creates
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-08

3. Acceptance

4. Plan

(Implementation strategy. Written when work starts; key decisions are distilled into the parent story's * Decisions at close, but the plan itself stays — it is the historical record of what we did.)

5. Measurements

Every number this task claims about a tree, with the command that produced it and the commit it was measured at. A number without both is not a measurement, because a clean-up record describes a tree and trunk moves under a branch: a consumer count, a gate's component count and a suite's size all change with no code changing, and the reader of a bare number cannot tell which tree it came from. Where the raw output matters, put it in an evidence/ file beside the task and name that file in the Command column.

What Value Command Commit
       

6. Notes

7. Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

8. PRs

PR Title
#2793 [agile] Give the process run its own story

9. Review

Comment summary File Decision Notes
       

10. Result

The story and its five tasks exist, the sprint lists it, and the run tasks moved here from the trade activities story with their ids intact. The story sits in the backlog and waits on a pilot process.

Emacs 29.3 (Org mode 9.6.15)