This page documents a story in Sprint 29, carried unfinished from Sprint 28 at close. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

The grid's global view answers which tenant is using what, from what the installation observed about its own operation. No policy is widened, no cross-tenant read is added, and no tenant's content leaves its tenant.

2. Status

Field Value
State DONE
Parent sprint Sprint 29
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-11-08

3. Acceptance

The story closes on the tasks it finished:

  • Reconcile the grid stories with the code.

4. Tasks

Task State Start End Description
Reconcile the grid stories with the code BACKLOG     Compare the grid stories and backlog captures with what the code does, and correct the paperwork.

5. Decisions

  • 2026-10-21: The counts of work per tenant and party are served by entering each tenant (9ff9426cab) after the system tenant's read of every tenant's grid work was removed (7cebe734ac). This met the first question, who uses the grid, without a ledger of usage rows. The second question, how much compute a tenant used over a window, still needs the run statistics of Draw the node heatmap and carry the engine run statistics. The usage row of the first task is open until that story decides whether the statistics on the result replace it.
  • Closed on 2026-11-08 at sprint 29 close with its done tasks. The open tasks and the original acceptance moved to Account for the grid's usage — the remaining work.

6. Out of scope