Story: Build the Connectivity screens
Table of Contents
This page documents a story in Sprint 29. It captures the goal, current status, acceptance criteria, and the tasks that compose it.
1. Goal
The signed-off Connectivity prototype becomes the screen: the delivery tree, the supplier dashboard, the adapter catalogue, the session and feed records, and the two setup flows, backed by reads and writes.
2. Status
| Field | Value |
|---|---|
| State | DONE |
| Parent sprint | Sprint 29 |
| Now | Nothing. |
| Waiting on | Nothing. |
| Next | Nothing. |
| Last touched | 2026-11-08 |
3. Acceptance
The story closes on the tasks it finished:
- Draw the session and feed records.
- Draw the supplier tree and dashboard.
4. Tasks
| Task | State | Start | End | Description |
|---|---|---|---|---|
| Draw the supplier tree and dashboard | DONE | 2026-10-31 | The delivery tree and the supplier dashboard with attention, coverage and recent feeds. | |
| Draw the session and feed records | DONE | 2026-10-31 | Session transport, runtime and feeds; feed overview, scope, schedule and routes. |
5. Decisions
- The screen follows the prototype; the prototype is the specification.
- The tree is the delivery axis; publishers are the second tree.
- No adapter is created from the screen.
- Closed on 2026-11-08 at sprint 29 close with its done tasks. The open tasks and the original acceptance moved to Build the Connectivity screens — the remaining work.