Story: Build the Connectivity screens

Table of Contents

This page documents a story in Sprint 29. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

The signed-off Connectivity prototype becomes the screen: the delivery tree, the supplier dashboard, the adapter catalogue, the session and feed records, and the two setup flows, backed by reads and writes.

2. Status

Field Value
State DONE
Parent sprint Sprint 29
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-11-08

3. Acceptance

The story closes on the tasks it finished:

  • Draw the session and feed records.
  • Draw the supplier tree and dashboard.

4. Tasks

Task State Start End Description
Draw the supplier tree and dashboard DONE   2026-10-31 The delivery tree and the supplier dashboard with attention, coverage and recent feeds.
Draw the session and feed records DONE   2026-10-31 Session transport, runtime and feeds; feed overview, scope, schedule and routes.

5. Decisions

  • The screen follows the prototype; the prototype is the specification.
  • The tree is the delivery axis; publishers are the second tree.
  • No adapter is created from the screen.
  • Closed on 2026-11-08 at sprint 29 close with its done tasks. The open tasks and the original acceptance moved to Build the Connectivity screens — the remaining work.

6. Out of scope