Task: Read a report's runs and one run's results

Table of Contents

This page documents a task in the Prove the report grid run end to end — the remaining work story. It captures the goal, current status, acceptance, and any notes or results.

1. Goal

A person opens a report, reads its definition first, then its runs, and opens one run to read both what it says about itself and the figures it produced.

2. Status

Field Value
State DONE
Parent story Prove the report grid run end to end — the remaining work
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-25

3. Acceptance

  • The report page draws Definition first, then Runs, and nothing else.
  • The Runs tab lists the report's runs newest first with state, times and priced date.
  • Each run offers Details and Results.
  • A run's page carries Run and Results, the run's message and output archive under Run.
  • A result is never shown without the run it came from.

4. Plan

(Implementation strategy. Written when work starts; key decisions are distilled into the parent story's * Decisions at close, but the plan itself stays — it is the historical record of what we did.)

5. Measurements

Every number this task claims about a tree, with the command that produced it and the commit it was measured at. A number without both is not a measurement, because a clean-up record describes a tree and trunk moves under a branch: a consumer count, a gate's component count and a suite's size all change with no code changing, and the reader of a bare number cannot tell which tree it came from. Where the raw output matters, put it in an evidence/ file beside the task and name that file in the Command column.

What Value Command Commit
       

6. Notes

7. Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

8. PRs

PR Title
#3846 [web] Keep the definition first and read results on the run

9. Review

Comment summary File Decision Notes
       

10. Result

A report now keeps its definition first and puts its runs beside it, and a result is only ever read on the run that produced it.

The report page has two tabs. Definition is the record, and it is the tab that opens. Runs lists the report's runs newest first with the state each reached, when it started and finished, and the date it priced at. Each row offers two things: Details, the run's own page, and Results, the same page with the figures open.

A run's page carries two tabs. Run states the report the run came from, its kind, its state, its times, the date it priced at with the note explaining a substituted date, what the run said when it finished, the output archive's key with a download, and the way to the run's errors. Results is the figures: the trade count, the total of each currency, then one row per trade.

The run that shows it is 9ff0e92e-f21d-4137-bb24-ad4956fa99f0, on the NPV definition of ACME Corporation HK Ltd. Its Run tab says Report execution completed. and names reporting/runs/9ff0e92e-.../output.tar.gz. Its Results tab shows eight bond trades and a total NPV of 31,607,092.99 HKD.

The earlier task put results on the definition's own page, which read figures without the run that produced them and hid the definition behind them. This task replaces that.

Emacs 29.3 (Org mode 9.6.15)