Task: Design the published curve screens and decide the publish model gaps

Table of Contents

This page documents a task in the Rework the market data feeds into a market data service with adapters — the remaining work story. It captures the goal, current status, acceptance, and any notes or results.

1. Goal

A signed-off prototype for the three screen surfaces and journey decisions for the four model items, before any implementation.

2. Status

Field Value
State DONE
Parent story Rework the market data feeds into a market data service with adapters — the remaining work
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-27

3. Acceptance

  • A prototype with the published-curves list, the delta view and the queue subject, with its paperwork.
  • The four model items decided in the journeys, each with its rule and open questions.

4. Plan

(Implementation strategy. Written when work starts; key decisions are distilled into the parent story's * Decisions at close, but the plan itself stays — it is the historical record of what we did.)

5. Measurements

Every number this task claims about a tree, with the command that produced it and the commit it was measured at. A number without both is not a measurement, because a clean-up record describes a tree and trunk moves under a branch: a consumer count, a gate's component count and a suite's size all change with no code changing, and the reader of a bare number cannot tell which tree it came from. Where the raw output matters, put it in an evidence/ file beside the task and name that file in the Command column.

What Value Command Commit
       

6. Notes

7. Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

8. PRs

PR Title
   

9. Review

Comment summary File Decision Notes
       

10. Result

Signed off on 2026-10-27.

  • The prototype draws the published curve list, the record page with Details, Published points, Compare as of and History, the last N published sets overlaid in the IR process style, the two-curve comparison, and the queue row carrying the publish subject.
  • The withdrawals, the zero-approval path, the publish notice and the maker/checker pair are decided in their journeys, each with its rule, its alternative and its open questions.
  • The note records the open questions: the CSV export, the aside's stats, the count's cap, ended sets in the overlay, the missing last-N read, the Revert absence, the decision merged into the history, and the baseline and axis choices.

Implementation follows the sign-off.

Emacs 29.3 (Org mode 9.6.15)