Story: Sprint health review — System 2 analysis

Table of Contents

This page documents a story in Sprint 29. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

A System 2 review of sprint 29. Each review measures the dimensions the skill names, challenges its own readings, and writes one verdict with the evidence behind it.

2. Status

Field Value
State DONE
Parent sprint Sprint 29
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-11-08

3. Acceptance

  • The review measures goal alignment, sprint load, PR velocity, story and task balance, focus signal, velocity and the overall verdict.
  • Every number in the review is a measurement with the command that produced it and the commit it was taken at, or is marked as an estimate with its basis.
  • The sprint's Health Review table carries the review's summary row.

4. Tasks

Task State Start End Description
Health review 1 — sprint 29 overrun analysis DONE 2026-11-08 2026-11-08 System 2 health review 1 of sprint 29.

5. Decisions

6. Out of scope

Emacs 29.3 (Org mode 9.6.15)