Story: Switch the interface between light and dark, and choose the language from the header

Table of Contents

This page documents a story in Sprint 29. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

(Describe the user-visible outcome this story delivers.)

2. Status

Field Value
State DONE
Parent sprint Sprint 29
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-31

3. Acceptance

4. Tasks

Task State Start End Description
Put the theme and the language in the header DONE 2026-10-31 2026-10-31 A light palette beside the dark one, a button that switches between them with the sun and the moon the icon set draws, and a globe that opens the three languages. The language leaves the account menu.

5. Decisions

6. Out of scope

Emacs 29.3 (Org mode 9.6.15)