Story: Design and seed the reports, configurations and portfolio trees each ACME party runs

Table of Contents

This page documents a story in Sprint 30, carried unfinished from Sprint 28 at close. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

Each ACME party gets the reports it would really run, with the configuration those reports need and a realistic portfolio tree, root portfolio and currencies.

2. Status

Field Value
State DONE
Parent sprint Sprint 30
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-11-08

3. Acceptance

  • A design document states, for each of the four parties, which reports it runs and why, from its role, its jurisdiction and its place in the group, with the alternative rejected.
  • Provisioning gives each party only the reports in the design, and each party's report definitions carry the configuration they need with a base currency that matches the party.
  • Each party has a realistic portfolio tree, root portfolio and currencies, and each report scope names portfolios that exist for that party.
  • The seeds the task touches carry no comment that states a count, and the task records what a clean provision did not prove.

4. Tasks

Task State Start End Description
Design the reports, configs and portfolio trees each ACME party runs DONE 2026-10-11 2026-11-08 Give each ACME party the reports it would really run, with the configuration those reports need and a realistic portfolio tree, root portfolio and currencies. Record and justify every decision for later review.

5. Decisions

  • PRs #3128 and #3136 delivered the design and the seeds. (review at sprint 30 start, 2026-11-08.)

6. Out of scope