Task: Record the run statistics on the result
Table of Contents
This page documents a task in the Draw the node heatmap and carry the engine run statistics story. It captures the goal, current status, acceptance, and any notes or results.
1. Goal
A result states when its run started and finished, how many bytes it read and wrote, and its peak memory, so the Jobs tab can show them.
2. Status
| Field | Value |
|---|---|
| State | BACKLOG |
| Parent story | Draw the node heatmap and carry the engine run statistics |
| Now | Not built. Checked at 3425f340d7: the result table and the wrapper carry none of it. |
| Waiting on | Nothing. |
| Next | Add the columns and carry them in the submit message. |
| Last touched | 2026-10-21 |
3. Acceptance
- The result model and its SQL hold the five fields, nullable for runs in flight and for results written before the change.
- compute.v1.ops.submit_result carries the five fields and the handler stores them.
- The generated reads return them.
4. Plan
(Implementation strategy. Written when work starts; key decisions
are distilled into the parent story's * Decisions at close, but the
plan itself stays — it is the historical record of what we did.)
5. Measurements
Every number this task claims about a tree, with the command that produced it
and the commit it was measured at. A number without both is not a measurement,
because a clean-up record describes a tree and trunk moves under a branch: a
consumer count, a gate's component count and a suite's size all change with no
code changing, and the reader of a bare number cannot tell which tree it came
from. Where the raw output matters, put it in an evidence/ file beside the
task and name that file in the Command column.
| What | Value | Command | Commit |
|---|---|---|---|
6. Notes
7. Test Scenarios
Manual QA scenarios (scaffolded via compass add test_scenario)
that verify this task. Link
new ones here as they're created; the scenario doc itself links back
via its "Verifies task" field.
| Scenario | State | Notes |
|---|---|---|
8. PRs
| PR | Title |
|---|---|
9. Review
| Comment summary | File | Decision | Notes |
|---|---|---|---|