Task: Repair the baseline drift the gate reports
Table of Contents
This page documents a task in the Rework the market data feeds into a market data service with adapters — the remaining work story. It captures the goal, current status, acceptance, and any notes or results.
1. Goal
The local gate is green on main again, with each repair traced to the merge that caused it.
2. Status
| Field | Value |
|---|---|
| State | DONE |
| Parent story | Rework the market data feeds into a market data service with adapters — the remaining work |
| Now | Nothing. |
| Waiting on | Nothing. |
| Next | Nothing. |
| Last touched | 2026-10-25 |
3. Acceptance
- Every failing static check passes on a clean checkout of main.
- The generated scripts, recipes, diagrams and baselines are regenerated, not hand-edited.
- The reporting pgTAP expectation covers the scopes the dataset states.
4. Plan
(Implementation strategy. Written when work starts; key decisions
are distilled into the parent story's * Decisions at close, but the
plan itself stays — it is the historical record of what we did.)
5. Measurements
Every number this task claims about a tree, with the command that produced it
and the commit it was measured at. A number without both is not a measurement,
because a clean-up record describes a tree and trunk moves under a branch: a
consumer count, a gate's component count and a suite's size all change with no
code changing, and the reader of a bare number cannot tell which tree it came
from. Where the raw output matters, put it in an evidence/ file beside the
task and name that file in the Command column.
| What | Value | Command | Commit |
|---|---|---|---|
6. Notes
7. Test Scenarios
Manual QA scenarios (scaffolded via compass add test_scenario)
that verify this task. Link
new ones here as they're created; the scenario doc itself links back
via its "Verifies task" field.
| Scenario | State | Notes |
|---|---|---|
8. PRs
| PR | Title |
|---|---|
| #3774 | [codegen] Green the baseline the commodity merge left red |
9. Review
| Comment summary | File | Decision | Notes |
|---|---|---|---|
10. Result
Delivered by PR #3774.