Story: Implement the full report pipeline

Table of Contents

This page documents a story in Product backlog — inbox. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

One report definition runs end to end from the scheduler through the workflow to the compute grid and back, with report pre- and post-processing, the orchestration contract, the substituted and live proofs, and a measured baseline. The design, the documentation and the run configuration shipped with the source story; this story is the implementation. The target state is written as Report Processing.

This story was split from Run a full report: scheduling, reporting and compute when that story was reworded to the design and the run configuration it delivered and closed DONE at the sprint 26 close on 2026-10-05; its eight remaining tasks moved here.

2. Status

Field Value
State BACKLOG
Parent sprint Sprint 26
Now Not yet started.
Waiting on Nothing.
Next Implement the phases, define the orchestration contract, and prove both runs.
Last touched 2026-10-05

3. Acceptance

  • A run with both ends substituted executes the real scheduler, the real workflow, the real grid and the real storage, and records that it was substituted.
  • A run with neither end substituted reads live trades and market data, and records the engine's results.
  • Report processing has a measured baseline, and the reporting handlers use the engine's idempotency check.

4. Tasks

Task State Start End Description
Implement Run a full report: scheduling, reporting and compute BACKLOG     Initial task for: Run a full report: scheduling, reporting and compute
Implement report post-processing BACKLOG     Task for: Run a full report: scheduling, reporting and compute
Implement report pre-processing BACKLOG     Task for: Run a full report: scheduling, reporting and compute
Measure report processing and record a baseline BACKLOG     Task for: Run a full report: scheduling, reporting and compute
Define and enforce the orchestration contract BACKLOG     Task for: Run a full report: scheduling, reporting and compute
Prove the full pipeline against live data BACKLOG     Task for: Run a full report: scheduling, reporting and compute
Prove the pipeline with both ends substituted BACKLOG     Task for: Run a full report: scheduling, reporting and compute
Use the engine's idempotency check in the reporting handlers BACKLOG     No reporting handler checks whether the step it is answering has already run, so a run recovered after a restart repeats the work of every phase it re-dispatches.
Price the bonds a report run carries DONE   2026-10-16 Task for: Implement the full report pipeline

5. Decisions

6. Out of scope