Task: Prove the pipeline with both ends substituted

Table of Contents

This page documents a task in the Implement the full report pipeline story. It captures the goal, current status, acceptance, and any notes or results.

1. Goal

Run a definition whose configuration substitutes both pre-processing and post-processing, and show that the middle of the pipeline executes for real: the scheduler fires, the workflow builds the substituted chain, the grid runs the engine, the output reaches storage, and the run records that it was substituted.

2. Status

Field Value
State BACKLOG
Parent story Implement the full report pipeline
Now Not yet started.
Waiting on Nothing.
Next Begin implementation.
Last touched 2026-09-27

3. Acceptance

  • The instance reaches a terminal state through the state machine, and records which phases were substituted.
  • The engine runs and its output object exists in storage, on a database recreated from scratch.
  • The run is kept as a repeatable check, and it proves nothing about the phases it replaced.

4. Plan

(Implementation strategy. Written when work starts; key decisions are distilled into the parent story's * Decisions at close, but the plan itself stays — it is the historical record of what we did.)

5. Measurements

Every number this task claims about a tree, with the command that produced it and the commit it was measured at. A number without both is not a measurement, because a clean-up record describes a tree and trunk moves under a branch: a consumer count, a gate's component count and a suite's size all change with no code changing, and the reader of a bare number cannot tell which tree it came from. Where the raw output matters, put it in an evidence/ file beside the task and name that file in the Command column.

What Value Command Commit
       

6. Notes

7. Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

8. PRs

PR Title
   

9. Review

Comment summary File Decision Notes
       

10. Result

Emacs 29.3 (Org mode 9.6.15)