Sprint 04
Table of Contents
This page documents a sprint (Sprint 04) of ORE Studio v0. It captures the sprint's mission, current status, and the stories that compose it. For the surrounding context — version goals, sprint order, and product identity — see Version 0.
Mission
LLM-driven code review and follow-on refactors; complete the currencies UI; introduce the Claude Code skills layer.
Status
| Field | Value |
|---|---|
| State | DONE |
| Parent version | Version 0 |
| Previous | Sprint 03 |
| Start | 2025-11-07 |
| End (expected) | 2025-11-16 |
| Now | Nothing. |
| Waiting on | Nothing. |
| Next | Sprint 05 |
| Release Notes | Release notes |
| Last touched | 2025-11-30 |
Achievements
- LLM-driven review pass complete across the first three components.
- Currencies UI feature-complete.
- Claude Code skills layer established in the build.
Stories
For the definitions of the themes see Themes.
Infrastructure
| Story | State | Start | End | Description |
|---|---|---|---|---|
| Test infrastructure follow-up | DONE | 2025-11-20 | successor of sprint 03's BLOCKED CTest item. | |
| Build and packaging | DONE | 2025-11-20 | Windows install end-to-end, localtime fix, shutdown crash, sqlgen leak fixes. |
Product
| Story | State | Start | End | Description |
|---|---|---|---|---|
| UI polish and branding | DONE | 2025-11-22 | splash, Fluent icons, application icon, window-management defaults. | |
| Currencies UI | DONE | 2025-11-25 | export, edit, add, history, multi-select. Pattern-setter for later reference-data UIs. |
LLMs
| Story | State | Start | End | Description |
|---|---|---|---|---|
| Claude Code skills introduction | DONE | 2025-11-15 | first skill, CMake deploy targets, weaving analysis. | |
| LLM code review and refactor | DONE | 2025-11-28 | review pass + Dogen-layout restructure + per-component PlantUML. |
Documentation
| Story | State | Start | End | Description |
|---|---|---|---|---|
| Documentation polish | DONE | 2025-11-30 | website restructure following the weaving analysis, Doxygen main-page refresh. |
Agile
| Story | State | Start | End | Description |
|---|---|---|---|---|
| Sprint 04 housekeeping | DONE | 2025-11-30 | backlog refinement plus a new pie-chart resourcing report. |
Charts
Charts generated via sprint_charts cmake target.
PRs & Commits per Day
Dual-axis bar chart. PRs (left axis) and commits (right axis) per day. A high commits-to-PR ratio may indicate scope creep.
Daily Line Churn
Lines added (green) and deleted (red) per day. Building work produces mostly additions; refactoring produces a mix. Days with no churn may indicate blockers.
Cumulative Stories Done
Line chart tracking stories marked DONE during the sprint. Steady upward slope is healthy; plateauing signals a stall.
Retrospective
- What worked
- the LLM review pass produced enough actionable items to fill its own story plus follow-ons in successor sprints. The MASD-influenced weaving analysis turned out to be load-bearing — it's why doc_polish lands now and why the skills layer becomes a real build target rather than a side project.
- What did not
- two long-tail items carry forward as
BLOCKEDagain (CDash warning filters; macOS package via GitHub images). The split between currencies UI work and "UI polish" was fuzzier than it should have been — several entries plausibly belonged to either story. - Carry forward to v2
- the BLOCKED-then-resolved pattern (sprint 03 → sprint 04 for the CTest item) is the first concrete use of the cross-sprint predecessor/successor link mechanism. Worth preserving in subsequent sprints.