Story: Sprint health review — System 2 analysis

Table of Contents

This page documents a story in Sprint 21. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

Goal

Produce a structured System 2 health review of sprint 21 covering goal alignment, sprint load, PR velocity, focus signal, and story/task balance.

Status

Field Value
State DONE
Parent sprint Sprint 21
Now Health review 1 complete.
Waiting on Nothing.
Next Nothing.
Last touched 2026-06-29

Acceptance

  • Review written and filed in task Result; summary row added to sprint.org Health Review section.

Tasks

Task State Start End Description
Health review 1 — sprint 21 close analysis DONE 2026-06-29 2026-06-29 System 2 health review 1 of sprint 21: close analysis.
Health review 2 — sprint 21 close analysis BACKLOG     System 2 health review 2 of sprint 21 — day 20, 13 days past planned close.

Decisions

Out of scope

  • Writing release notes (separate sprint close step).
  • Fixing the identified drift — that is tracked as follow-up tasks.