Story: Open sprint 25

Table of Contents

This page documents a story in Sprint 25. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

Goal

Sprint 25 exists as a proper agile artefact (scaffolded, wired into the version manifest and agile index), sprint 24's remaining bookkeeping drift is resolved, and the build-side housekeeping that always accompanies a sprint open (version bump, vcpkg submodule update) lands verified.

Status

Field Value
State DONE
Parent sprint Sprint 25
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-08-04

Acceptance

Tasks

Task State Start End Description
Open sprint 25 DONE 2026-08-03 2026-08-04 Scaffold sprint 25, wire version manifest, move postponed stories, and bump the project version.

Decisions

Out of scope

Result

Sprint 25 opened and wired in; sprint 24 fully closed out (bookkeeping drift resolved, retrospective written, cross-links added). Version bumped to 0.0.25 and vcpkg updated to latest, both verified with a full clean build and 71/71 tests passing.