Story: Sprint 25 closure: story cleanup and reset for sprint 26

Table of Contents

This page documents a story in Sprint 25. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

Own the final steps of sprint 25: the close health review, a cleanup that leaves no half-finished stories for sprint 26, the release notes and the retrospective.

2. Status

Field Value
State DONE
Parent sprint Sprint 25
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-09-23

3. Acceptance

  • Every other sprint 25 story is DONE or ABANDONED, and compass sprint audit is clean.
  • Release notes are generated and linked from the sprint's Status table.
  • The sprint's Retrospective section is filled.

4. Tasks

Task State Start End Description
Clean up the sprint 25 stories for close DONE 2026-09-23 2026-09-23 Close every finished story, abandon the superseded and half-finished ones, split the skills catalogue story, and file one capture for the IR work.
Write sprint 25 release notes DONE 2026-09-23 2026-09-23 Generate the sprint 25 release notes from the merged PR data, fill the summary blurbs, render the charts and export the markdown for the draft GitHub release.

5. Decisions

6. Out of scope

7. Result

Sprint 25 is closed out. Health review 2 rated the sprint RED. Every other story is DONE (79) or ABANDONED (23), each with its reason, and compass sprint audit is clean. The skills catalogue remainder is an inbox story, and the IR work is one deferred capture. The release notes, the charts over the full sprint and the retrospective are written. The v0.0.25 tag and the draft GitHub release follow the merge.

Emacs 29.3 (Org mode 9.6.15)