Task: Open sprint 29

Table of Contents

This page documents a task in the Open sprint 29 story. It captures the goal, current status, acceptance, and any notes or results.

1. Goal

(Describe what user-visible-or-internal change this task produces.)

2. Status

Field Value
State DONE
Parent story Open sprint 29
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-10-24

3. Acceptance

4. Plan

(Implementation strategy. Written when work starts; key decisions are distilled into the parent story's * Decisions at close, but the plan itself stays — it is the historical record of what we did.)

5. Measurements

Every number this task claims about a tree, with the command that produced it and the commit it was measured at. A number without both is not a measurement, because a clean-up record describes a tree and trunk moves under a branch: a consumer count, a gate's component count and a suite's size all change with no code changing, and the reader of a bare number cannot tell which tree it came from. Where the raw output matters, put it in an evidence/ file beside the task and name that file in the Command column.

What Value Command Commit
       

6. Notes

7. Test Scenarios

Manual QA scenarios (scaffolded via compass add test_scenario) that verify this task. Link new ones here as they're created; the scenario doc itself links back via its "Verifies task" field.

Scenario State Notes
     

8. PRs

PR Title
#3713 [agile] Open sprint 29 and add the sprint 28 release material

9. Review

Comment summary File Decision Notes
       

10. Result

Sprint 29 is scaffolded and wired into the version manifest and the agile index, and PR 3713 merged it with the v0.0.28 release material: nine captioned ores.web screenshots, the release notes, the downloads page, the readme and a homepage carousel with no Qt screenshots. The rest of the open sprint recipe is in the task Finish opening sprint 29.

Emacs 29.3 (Org mode 9.6.15)