Story: Open sprint 29

Table of Contents

This page documents a story in Sprint 29. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

1. Goal

(Describe the user-visible outcome this story delivers.)

2. Status

Field Value
State DONE
Parent sprint Sprint 29
Now Nothing.
Waiting on Nothing.
Next Nothing.
Last touched 2026-11-08

3. Acceptance

The story closes on the tasks it finished:

  • Close the flip story and move coverage to the population story.
  • Finish opening sprint 29.
  • Open sprint 29.
  • Wire the captures into the backlog index.

4. Tasks

Task State Start End Description
Task: Open sprint 29 DONE 2026-10-24 2026-10-24 Open sprint 29: scaffold, wire, and move the postponed stories.
Finish opening sprint 29 DONE 2026-10-24 2026-10-24 The first sprint 29 PR did the scaffold and the release material. This task does the rest of the open-sprint recipe: the vcpkg update, the version bump, the postponed story and the promoted carried work.
Wire the captures into the backlog index DONE   2026-10-29 compass add capture writes the capture document but does not regenerate the bucket index, so a capture can exist without appearing in the backlog. The two this story filed on bonds and credit were in that state. Regenerate the index and record what the tooling does and does not do.
Close the flip story and move coverage to the population story DONE 2026-10-30 2026-10-30 The flip story's tasks are terminal but the story is not closed, and four tasks in it belong to population coverage rather than to what a plan states. Move them, delete two stale docs, rewrite the acceptance to match the arc, and close.

5. Decisions

6. Out of scope