Story: Open sprint 29
Table of Contents
This page documents a story in Sprint 29. It captures the goal, current status, acceptance criteria, and the tasks that compose it.
1. Goal
(Describe the user-visible outcome this story delivers.)
2. Status
| Field | Value |
|---|---|
| State | DONE |
| Parent sprint | Sprint 29 |
| Now | Nothing. |
| Waiting on | Nothing. |
| Next | Nothing. |
| Last touched | 2026-11-08 |
3. Acceptance
The story closes on the tasks it finished:
- Close the flip story and move coverage to the population story.
- Finish opening sprint 29.
- Open sprint 29.
- Wire the captures into the backlog index.
4. Tasks
| Task | State | Start | End | Description |
|---|---|---|---|---|
| Task: Open sprint 29 | DONE | 2026-10-24 | 2026-10-24 | Open sprint 29: scaffold, wire, and move the postponed stories. |
| Finish opening sprint 29 | DONE | 2026-10-24 | 2026-10-24 | The first sprint 29 PR did the scaffold and the release material. This task does the rest of the open-sprint recipe: the vcpkg update, the version bump, the postponed story and the promoted carried work. |
| Wire the captures into the backlog index | DONE | 2026-10-29 | compass add capture writes the capture document but does not regenerate the bucket index, so a capture can exist without appearing in the backlog. The two this story filed on bonds and credit were in that state. Regenerate the index and record what the tooling does and does not do. | |
| Close the flip story and move coverage to the population story | DONE | 2026-10-30 | 2026-10-30 | The flip story's tasks are terminal but the story is not closed, and four tasks in it belong to population coverage rather than to what a plan states. Move them, delete two stale docs, rewrite the acceptance to match the arc, and close. |
5. Decisions
- Closed on 2026-11-08 at sprint 29 close with its done tasks. The open tasks and the original acceptance moved to Open sprint 29 — the remaining work.