Story: Librarian polish

Table of Contents

This page documents a story in Sprint 10. It captures the goal, current status, acceptance criteria, and the tasks that compose it.

Goal

Address the PR-review feedback on the Data Librarian landed in sprint 09. Some of the review work ran out of token budget last sprint and was carried into this one.

Status

Field Value
State DONE
Parent sprint Sprint 10
Now Completed 2026-01-27.
Waiting on None.
Next None.
Last touched 2026-01-27

Continued from: Data Quality subsystem and Data Librarian (sprint 09) — polishes the librarian based on PR-review feedback from the sprint 09 work.

Acceptance

  • Domain view + edit work.
  • Dimension nodes in the tree as filters.
  • Dependency diagram consumes the new message.
  • Country flags load reliably after restart.
  • Outstanding items raised as follow-up stories.

Tasks

Task State Start End Description
Fix code review comments for librarian DONE 2026-05-19 2026-01-27 PR review fixes: domain viewing/editing; dimension nodes in the tree as filters; dependency-message diagram check; country flags load after restart; header colour vs row colour; namespace crypto icons vs country flags (AE clash); publish-failure error visibility (raised as separate story).

Decisions

Raise visual-polish items as follow-ups
header/row colour and the crypto/country flag clash are separately scoped; not worth holding the librarian-polish PR for them.

Out of scope

  • Publish-failure error visibility (raised separately).
  • Crypto-vs-country flag namespace clash (raised separately).